DFL
Job Number:
Project Description
Tie-In on 10km and laying of 36" at Section E, KP 2 and KP0, Lekki Gas Pipeline Project - LFTZ
Vista-Bill has carried out hot tap services extensively and successfully for making branch connections into operating piping systems, heat exchangers, vessels, columns, tanks and pipelines.
We can handle the job without shutdown or interruption of critical pipeline systems and processes.
This is the proccess of cutting metallic pipelines during pipe replacement, to create avenue for the removal of the damaged section.
Our extensive portfolio of solutions includes controlled bolting, flange working equipment, portable machines and many other complementary products.
Vista-Bill uses high quality fittings to repair and maintain high-pressure lines without shutdown or interruption of service.
We procures equiments and fittings for Hot Tap/Stopple operations - including split tees, valves and flanges.
We tap probe installation lines from 1/2" to 3" holes on existing pressure lines for installations including line gauges and pig signals.
Vista-Bill repair services helps prevent unwanted shutdown and keep critical piping and pipeline systems in service during tie-ins, relocations, repairs, retrofits and routine maintenance.
Vista-Bill ensure that world-class services are delivered with adherence to the highest global practices, safety standards and sensitivity to our environment.
Our fabrication capabilities encompass piping, civil, structural, steel and module prefabrication & assembly in the categories of offshore and onshore fabrication at either domestic or international locations.
We also have expertise in FRP/GRE Fabrication and welding of various steel including stainless steel, carbon steel and duplex using a wide range of processes such as:
• SMAW
• Orbital welding
• TIG welding
• SAW
Our proven Construction Management capabilities combined with our experienced Inspection Services Team provides Total Project Delivery on any project.
Our Construction and Installation Team have expertise and management experience in the various offshore & onshore facilities.
Completion Date
2019
Job Number:
Project Description
Tie-In on 10km and laying of 36" at Section E, KP 2 and KP0, Lekki Gas Pipeline Project - LFTZ
Completion Date
2019
Job Number:
Project Description
Construction and Laying of 30" (0.6km) Pipline and riser from Hot-Tap Tie-In on 36" ELP 2 Line KP-292 to Dangote Fertilizer Limited LFTZ Launcher Manifold - Madoja, Lagos State.
Completion Date
2019
Job Number:NGC/DLF/ZNCL/01
Project Description
Procurment, Welding & Hot-Tapping on 36"X30"X600# NNPC/Cheveron ELP 1 KP-292 Piplines - Madoja, Lagos State.
Completion Date
2019
Job Number: NGC/DLF/ZNCL/02
Project Description
Construction and Laying of 30" (0.6km) Pipline and riser from Cold Cut Tie-In on 36" ELP 2 Line KP-292 to Dangote Fertilizer Limited LFTZ Launcher Manifold - Madoja, Lagos State.
Completion Date
December 12th 2018
Job Number: HT/YP/VBIL/DNL/MRS/NPSC/001
Project Description
8" Hot Tapping Operation on 16" System 2E Crude Oil Pipline
Completion Date
August 12th 2018
Job Number: 412770
Project Description
2" x 10" 150 Class Weldolet, Welding and Hot Tap Operation
Completion Date
April 23rd 2018
Job Number: PS2/HT/001
Project Description
24" x 36" Hot Tapping and Plugging Operation
Completion Date
June 23rd 2017
Project Description
Procurment and Hot Tapping of 10" x 8" x 600# on AGIP/INDORAMA PETROCHEMICAL pipline modification and improvement project.
Completed Date
29th April, 2017
Project Description
Hot Tapping of 9nos of 24" x 12" x 150# on MPN QIT produce water reliability improvement project.
Completion Date
May 31st 2016
Project Description
Hot Tapping from 24" to 18" Seven Energy East Horizon Gas Company (7E EHGC) carrier pipline at 65 bar.
Completion Date
JUNE 30, 2016.
Project Description
1.5 (38MM) X 33MM Wall Thickness, Two Point Hot Tapping for instrument connection at Wagpco Regulatory and Metering Station, Itoki.
Completion Date
JUNE 30, 2016.
Project Description
12" X 12" Hot Tap on Early Works on Early Gas Supply to PHCN powerplant at Alaoji Projects for NEXT OIL PLC.
Completion Date
JUNE 30, 2016.
Project
18" x 6" x 900# Hot Tap Operation (weldolet)
Job Number
MG-1650-005-12"-C43-V
Project Description
Hot Tapping on 18" MG Supply Line (18" x 6" x 900#) with weldolet Line
Job Number
BD-2250-001-12-BO1-V
Project Description
Hot Tapping on 12" Flare Header (12"x12"x300#) with spit Tee.
T101 Machine
Hot Tap machine which cuts from 1/2" to 3"
Hydraulic power pack
This mechine is used to power 760 to 1200 tapping mechine.
TM660 Hot Tapping Maching
This machine can do hot tap branch connections, ranging from 3" to 12".
T-1200 Hot Tapping Machine
This machine can assist in creating a branch connection ranging form 12" to 36" and installation of completion plug, between these ranges stated.
Line Stopple Equipment
Vista-Bill's cross section of line stopple equipment ranging from 4" to 36" operations.
Cutters
Various sizes of Hot Tap/Line Stop Cutters